<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:media="http://search.yahoo.com/mrss/"><channel><title><![CDATA[Mark Donnellon]]></title><description><![CDATA[Candidate for Kingborough Councill, promoting community, transport choices and sustainable development. ]]></description><link>https://mark.id.au/</link><image><url>https://mark.id.au/favicon.png</url><title>Mark Donnellon</title><link>https://mark.id.au/</link></image><generator>Ghost 5.87</generator><lastBuildDate>Thu, 22 Oct 2026 18:59:46 GMT</lastBuildDate><atom:link href="https://mark.id.au/rss/" rel="self" type="application/rss+xml"/><ttl>60</ttl><item><title><![CDATA[Huntingfield Landcare's First Working Bee]]></title><description><![CDATA[<p>This year I have been working on the creation of the Huntingfield Landcare group and on Saturday 4th July 17 people from Huntingfield, surrounds and as far away as Launceston came together for the first working bee!</p><figure class="kg-card kg-video-card kg-width-regular kg-card-hascaption" data-kg-thumbnail="https://mark.id.au/content/media/2026/07/coffee-creek-cleanup_thumb.jpg" data-kg-custom-thumbnail="https://mark.id.au/content/images/2026/07/vlcsnap-2026-07-05-17h05m45s250.png">
            <div class="kg-video-container">
                <video src="https://mark.id.au/content/media/2026/07/coffee-creek-cleanup.mp4" poster="https://img.spacergif.org/v1/1440x2560/0a/spacer.png" width="1440" height="2560" playsinline preload="metadata" style="background: transparent url(&apos;https://mark.id.au/content/images/2026/07/vlcsnap-2026-07-05-17h05m45s250.png&apos;) 50% 50% / cover no-repeat;"></video>
                <div class="kg-video-overlay">
                    <button class="kg-video-large-play-icon" aria-label="Play video">
                        <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                            <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                        </svg>
                    </button>
                </div>
                <div class="kg-video-player-container">
                    <div class="kg-video-player">
                        <button class="kg-video-play-icon" aria-label="Play video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-pause-icon kg-video-hide" aria-label="Pause video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <rect x="3" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                                <rect x="14" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                            </svg>
                        </button>
                        <span class="kg-video-current-time">0:00</span>
                        <div class="kg-video-time">
                            /<span class="kg-video-duration">0:46</span>
                        </div>
                        <input type="range" class="kg-video-seek-slider" max="100" value="0">
                        <button class="kg-video-playback-rate" aria-label="Adjust playback speed">1&#xD7;</button>
                        <button class="kg-video-unmute-icon" aria-label="Unmute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M15.189 2.021a9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h1.794a.249.249 0 0 1 .221.133 9.73 9.73 0 0 0 7.924 4.85h.06a1 1 0 0 0 1-1V3.02a1 1 0 0 0-1.06-.998Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-mute-icon kg-video-hide" aria-label="Mute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M16.177 4.3a.248.248 0 0 0 .073-.176v-1.1a1 1 0 0 0-1.061-1 9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h.114a.251.251 0 0 0 .177-.073ZM23.707 1.706A1 1 0 0 0 22.293.292l-22 22a1 1 0 0 0 0 1.414l.009.009a1 1 0 0 0 1.405-.009l6.63-6.631A.251.251 0 0 1 8.515 17a.245.245 0 0 1 .177.075 10.081 10.081 0 0 0 6.5 2.92 1 1 0 0 0 1.061-1V9.266a.247.247 0 0 1 .073-.176Z"/>
                            </svg>
                        </button>
                        <input type="range" class="kg-video-volume-slider" max="100" value="100">
                    </div>
                </div>
            </div>
            <figcaption><p><span style="white-space: pre-wrap;">A glimpse of the mess before we</span></p></figcaption></figure>]]></description><link>https://mark.id.au/huntingfield-landcares-first-working-bee/</link><guid isPermaLink="false">6a48a5d229e47f00010cedd7</guid><category><![CDATA[community]]></category><category><![CDATA[Event]]></category><category><![CDATA[Huntingfield]]></category><category><![CDATA[Kingborough]]></category><category><![CDATA[landcare]]></category><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Sun, 05 Jul 2026 08:45:27 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/07/IMG_0329.jpeg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/07/IMG_0329.jpeg" alt="Huntingfield Landcare&apos;s First Working Bee"><p>This year I have been working on the creation of the Huntingfield Landcare group and on Saturday 4th July 17 people from Huntingfield, surrounds and as far away as Launceston came together for the first working bee!</p><figure class="kg-card kg-video-card kg-width-regular kg-card-hascaption" data-kg-thumbnail="https://mark.id.au/content/media/2026/07/coffee-creek-cleanup_thumb.jpg" data-kg-custom-thumbnail="https://mark.id.au/content/images/2026/07/vlcsnap-2026-07-05-17h05m45s250.png">
            <div class="kg-video-container">
                <video src="https://mark.id.au/content/media/2026/07/coffee-creek-cleanup.mp4" poster="https://img.spacergif.org/v1/1440x2560/0a/spacer.png" width="1440" height="2560" playsinline preload="metadata" style="background: transparent url(&apos;https://mark.id.au/content/images/2026/07/vlcsnap-2026-07-05-17h05m45s250.png&apos;) 50% 50% / cover no-repeat;"></video>
                <div class="kg-video-overlay">
                    <button class="kg-video-large-play-icon" aria-label="Play video">
                        <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                            <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                        </svg>
                    </button>
                </div>
                <div class="kg-video-player-container">
                    <div class="kg-video-player">
                        <button class="kg-video-play-icon" aria-label="Play video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-pause-icon kg-video-hide" aria-label="Pause video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <rect x="3" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                                <rect x="14" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                            </svg>
                        </button>
                        <span class="kg-video-current-time">0:00</span>
                        <div class="kg-video-time">
                            /<span class="kg-video-duration">0:46</span>
                        </div>
                        <input type="range" class="kg-video-seek-slider" max="100" value="0">
                        <button class="kg-video-playback-rate" aria-label="Adjust playback speed">1&#xD7;</button>
                        <button class="kg-video-unmute-icon" aria-label="Unmute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M15.189 2.021a9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h1.794a.249.249 0 0 1 .221.133 9.73 9.73 0 0 0 7.924 4.85h.06a1 1 0 0 0 1-1V3.02a1 1 0 0 0-1.06-.998Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-mute-icon kg-video-hide" aria-label="Mute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M16.177 4.3a.248.248 0 0 0 .073-.176v-1.1a1 1 0 0 0-1.061-1 9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h.114a.251.251 0 0 0 .177-.073ZM23.707 1.706A1 1 0 0 0 22.293.292l-22 22a1 1 0 0 0 0 1.414l.009.009a1 1 0 0 0 1.405-.009l6.63-6.631A.251.251 0 0 1 8.515 17a.245.245 0 0 1 .177.075 10.081 10.081 0 0 0 6.5 2.92 1 1 0 0 0 1.061-1V9.266a.247.247 0 0 1 .073-.176Z"/>
                            </svg>
                        </button>
                        <input type="range" class="kg-video-volume-slider" max="100" value="100">
                    </div>
                </div>
            </div>
            <figcaption><p><span style="white-space: pre-wrap;">A glimpse of the mess before we started. </span></p></figcaption>
        </figure><p>The original goal was a simple rubbish clean up in the Coffee Creek reserve at the end of Ascot Drive, however the large amount of interest I had received meant we needed some more work to do! The rubbish took us less than an hour to collect so we moved on to addressing several weeds in the area that are painful to touch, compete with native vegetation and reduce habitat for native animals. </p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/07/weed-collage.png" class="kg-image" alt="Huntingfield Landcare&apos;s First Working Bee" loading="lazy" width="1080" height="1350" srcset="https://mark.id.au/content/images/size/w600/2026/07/weed-collage.png 600w, https://mark.id.au/content/images/size/w1000/2026/07/weed-collage.png 1000w, https://mark.id.au/content/images/2026/07/weed-collage.png 1080w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Top Left: Flowering gorse below and tall dead-looking thistle above. Top right: Montpelier broom in hand. Bottom left: A big patch of 1 - 2m tall gorse that had been knocked down by a falling tree branch. Bottom right: Weeds and bags of rubbish in the trailer. </span></figcaption></figure><p>Removed weeds included: </p><ul><li><strong>Gorse</strong>: A dense, woody, and highly spiky shrub that in some places grew so large it needed to be sawn at its base and painted with glyphosate. </li><li><strong>Montpelier broom</strong>: an invasive woody legume shrub with bright yellow pea-flowers and trifoliate leaves that forms dense thickets.</li><li><strong>Various thistle</strong>: aggressive colonising plants that establish quickly in disturbed or overgrazed ground, spread prolifically through wind-borne seed.</li><li><strong>Blackberry</strong>: a vigorous, thicket-forming woody weed introduced in the mid-1800s as a fruit and hedging plant before escaping to become a Weed of National Significance that smothers native vegetation and pasture and harbours pests.</li></ul><p></p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/07/PXL_20260704_032851603.jpg" class="kg-image" alt="Huntingfield Landcare&apos;s First Working Bee" loading="lazy" width="2000" height="1502" srcset="https://mark.id.au/content/images/size/w600/2026/07/PXL_20260704_032851603.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/07/PXL_20260704_032851603.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/07/PXL_20260704_032851603.jpg 1600w, https://mark.id.au/content/images/2026/07/PXL_20260704_032851603.jpg 2000w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Roland Painter, Jill Jones and Charlie Biggins removing blackberry along Coffee Creek. </span></figcaption></figure><p>For those that were there to see the before and after, the change was dramatic, bringing this pocket of the reserve back to the litter-free native bushland that we love Tasmania for. </p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/07/IMG_0331-cropped.jpeg" class="kg-image" alt="Huntingfield Landcare&apos;s First Working Bee" loading="lazy" width="1620" height="1215" srcset="https://mark.id.au/content/images/size/w600/2026/07/IMG_0331-cropped.jpeg 600w, https://mark.id.au/content/images/size/w1000/2026/07/IMG_0331-cropped.jpeg 1000w, https://mark.id.au/content/images/size/w1600/2026/07/IMG_0331-cropped.jpeg 1600w, https://mark.id.au/content/images/2026/07/IMG_0331-cropped.jpeg 1620w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">The group of volunteers removed 110KG of rubbish and weeds from the reserve. </span></figcaption></figure>]]></content:encoded></item><item><title><![CDATA[Youth Open Mic Night a HUGE success!]]></title><description><![CDATA[<p>This past Saturday my family attended an amazing Youth Open Mic Night organised by young Tilly and other volunteers with the Blackmans Bay Community Association (BBCA) at the Blackmans Bay Community Hall. </p><p>It was the third event, which is held every two months, and is proving to be very popular</p>]]></description><link>https://mark.id.au/youth-open-mic-night/</link><guid isPermaLink="false">6a40aca629e47f00010ced42</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Mon, 29 Jun 2026 12:11:51 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/06/PXL_20260627_084658960.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/06/PXL_20260627_084658960.jpg" alt="Youth Open Mic Night a HUGE success!"><p>This past Saturday my family attended an amazing Youth Open Mic Night organised by young Tilly and other volunteers with the Blackmans Bay Community Association (BBCA) at the Blackmans Bay Community Hall. </p><p>It was the third event, which is held every two months, and is proving to be very popular with seats filling up and attendees beginning to stand wherever they could get a good view.&#xA0;</p><figure class="kg-card kg-image-card"><img src="https://mark.id.au/content/images/2026/06/image.jpg" class="kg-image" alt="Youth Open Mic Night a HUGE success!" loading="lazy" width="1439" height="1080" srcset="https://mark.id.au/content/images/size/w600/2026/06/image.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/06/image.jpg 1000w, https://mark.id.au/content/images/2026/06/image.jpg 1439w" sizes="(min-width: 720px) 720px"></figure><p>Part of what has made this possible is Tilly&apos;s plan for ongoing community events that the BBCA used to apply for a Kingborough Council community grant to fund the purchase of sound engineer equipment. Kingborough Council approved the grant and the open mic night events have gone ahead, pulling in crowds of people across generations and providing these young people an approachable stage to practice and present their talents.&#xA0;</p><p>The BBCA will hold 5 events this year which are advertised across all public schools and to music teachers and is open to musicians aged 11 to 16. </p><p>One of the things that drew my family in was the opportunity for my five year old daughter, who enjoys music at school, to witness young people performing and hopefully build up her confidence. We heard from many talented young performers who will clearly benefit from a supportive place to practice and further build their own confidence. </p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/06/image--1-.jpg" class="kg-image" alt="Youth Open Mic Night a HUGE success!" loading="lazy" width="1439" height="1080" srcset="https://mark.id.au/content/images/size/w600/2026/06/image--1-.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/06/image--1-.jpg 1000w, https://mark.id.au/content/images/2026/06/image--1-.jpg 1439w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">The crowd gathers during intermission around a hot firepit with mugs of hot soup.</span></figcaption></figure><p>For the intermission, BBCA committee members had prepared different hot soups and bread for everyone to enjoy, free of charge, around a cozy fire pit. This was a great time for the community to connect and socialise. </p><figure class="kg-card kg-image-card"><img src="https://mark.id.au/content/images/2026/06/PXL_20260627_082408694-2.jpg" class="kg-image" alt="Youth Open Mic Night a HUGE success!" loading="lazy" width="2000" height="2501" srcset="https://mark.id.au/content/images/size/w600/2026/06/PXL_20260627_082408694-2.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/06/PXL_20260627_082408694-2.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/06/PXL_20260627_082408694-2.jpg 1600w, https://mark.id.au/content/images/2026/06/PXL_20260627_082408694-2.jpg 2000w" sizes="(min-width: 720px) 720px"></figure><p>This financial year, the council have budgeted for $30,000 of community grants. If you or your community group have an idea which will enhance the well-being of the Kingborough community, you could be eligible for up to $3000 funding to make your idea a reality!&#xA0;</p><p>Start writing down your plan now and read about the past community grant rounds on the Kingborough Council website.&#xA0;</p><p>The next Blackmans Bay Open Mic Night is scheduled for August 29th, at the Blackmans Bay Community Hall. </p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/06/PXL_20260627_092454582.NIGHT-1.jpg" class="kg-image" alt="Youth Open Mic Night a HUGE success!" loading="lazy" width="2000" height="1502" srcset="https://mark.id.au/content/images/size/w600/2026/06/PXL_20260627_092454582.NIGHT-1.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/06/PXL_20260627_092454582.NIGHT-1.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/06/PXL_20260627_092454582.NIGHT-1.jpg 1600w, https://mark.id.au/content/images/2026/06/PXL_20260627_092454582.NIGHT-1.jpg 2000w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">After the youth were done, two less young musicians who had only just met, kicked on with an improvised but excellent jam session. </span></figcaption></figure>]]></content:encoded></item><item><title><![CDATA[The Margate bridge campaign attracts a visit from an MP]]></title><description><![CDATA[<p>Roz Thurn invited Dr. Rosalie Woodruff MP, Cr. Amanda Midgley, Cr. Flora Fox and Mark Donnellon out to witness the isolation or danger that Margate residents have to choose from when crossing the North West Bay River Bridge by foot or bike.</p><p>Roz and many other locals have been campaigning</p>]]></description><link>https://mark.id.au/the-margate-bridge-campaign-attracts-a-visit-from-an-mp/</link><guid isPermaLink="false">6a16c8b31d66380001ab87b3</guid><category><![CDATA[Kingborough]]></category><category><![CDATA[Bikes]]></category><category><![CDATA[Huntingfield]]></category><category><![CDATA[health]]></category><category><![CDATA[community]]></category><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Thu, 28 May 2026 07:44:56 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/05/PXL_20260512_225520179-EDIT.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/05/PXL_20260512_225520179-EDIT.jpg" alt="The Margate bridge campaign attracts a visit from an MP"><p>Roz Thurn invited Dr. Rosalie Woodruff MP, Cr. Amanda Midgley, Cr. Flora Fox and Mark Donnellon out to witness the isolation or danger that Margate residents have to choose from when crossing the North West Bay River Bridge by foot or bike.</p><p>Roz and many other locals have been campaigning for the state government to install a pedestrian and bike bridge over the North West Bay River as the first step towards safely connecting Margate to destinations to the south on the Channel Highway. Including destinations like the bowls club, Margate train, golf club and further on to Howden and Huntingfield.</p><figure class="kg-card kg-gallery-card kg-width-wide"><div class="kg-gallery-container"><div class="kg-gallery-row"><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/05/Screenshot_20260517-174218-2.png" width="1080" height="1440" loading="lazy" alt="The Margate bridge campaign attracts a visit from an MP" srcset="https://mark.id.au/content/images/size/w600/2026/05/Screenshot_20260517-174218-2.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/Screenshot_20260517-174218-2.png 1000w, https://mark.id.au/content/images/2026/05/Screenshot_20260517-174218-2.png 1080w" sizes="(min-width: 720px) 720px"></div><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/05/Screenshot_20260517-174438-3.png" width="1080" height="1439" loading="lazy" alt="The Margate bridge campaign attracts a visit from an MP" srcset="https://mark.id.au/content/images/size/w600/2026/05/Screenshot_20260517-174438-3.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/Screenshot_20260517-174438-3.png 1000w, https://mark.id.au/content/images/2026/05/Screenshot_20260517-174438-3.png 1080w" sizes="(min-width: 720px) 720px"></div></div><div class="kg-gallery-row"><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/05/Screenshot_20260517-174703-2.png" width="1080" height="1440" loading="lazy" alt="The Margate bridge campaign attracts a visit from an MP" srcset="https://mark.id.au/content/images/size/w600/2026/05/Screenshot_20260517-174703-2.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/Screenshot_20260517-174703-2.png 1000w, https://mark.id.au/content/images/2026/05/Screenshot_20260517-174703-2.png 1080w" sizes="(min-width: 720px) 720px"></div><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/05/Screenshot_20260517-174832-3.png" width="1056" height="1409" loading="lazy" alt="The Margate bridge campaign attracts a visit from an MP" srcset="https://mark.id.au/content/images/size/w600/2026/05/Screenshot_20260517-174832-3.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/Screenshot_20260517-174832-3.png 1000w, https://mark.id.au/content/images/2026/05/Screenshot_20260517-174832-3.png 1056w" sizes="(min-width: 720px) 720px"></div></div></div></figure><p>The group of representatives discussed how they can help with their campaign and options for getting more attention and pressuring the state government to move forward with their long stagnant plans for connecting Margate and Huntingfield with a shared path.</p><figure class="kg-card kg-video-card kg-width-regular kg-card-hascaption" data-kg-thumbnail="https://mark.id.au/content/media/2026/05/margate-bridge-meet-trance_thumb.jpg" data-kg-custom-thumbnail>
            <div class="kg-video-container">
                <video src="https://mark.id.au/content/media/2026/05/margate-bridge-meet-trance.mp4" poster="https://img.spacergif.org/v1/1440x2560/0a/spacer.png" width="1440" height="2560" playsinline preload="metadata" style="background: transparent url(&apos;https://mark.id.au/content/media/2026/05/margate-bridge-meet-trance_thumb.jpg&apos;) 50% 50% / cover no-repeat;"></video>
                <div class="kg-video-overlay">
                    <button class="kg-video-large-play-icon" aria-label="Play video">
                        <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                            <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                        </svg>
                    </button>
                </div>
                <div class="kg-video-player-container">
                    <div class="kg-video-player">
                        <button class="kg-video-play-icon" aria-label="Play video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-pause-icon kg-video-hide" aria-label="Pause video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <rect x="3" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                                <rect x="14" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                            </svg>
                        </button>
                        <span class="kg-video-current-time">0:00</span>
                        <div class="kg-video-time">
                            /<span class="kg-video-duration">0:42</span>
                        </div>
                        <input type="range" class="kg-video-seek-slider" max="100" value="0">
                        <button class="kg-video-playback-rate" aria-label="Adjust playback speed">1&#xD7;</button>
                        <button class="kg-video-unmute-icon" aria-label="Unmute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M15.189 2.021a9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h1.794a.249.249 0 0 1 .221.133 9.73 9.73 0 0 0 7.924 4.85h.06a1 1 0 0 0 1-1V3.02a1 1 0 0 0-1.06-.998Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-mute-icon kg-video-hide" aria-label="Mute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M16.177 4.3a.248.248 0 0 0 .073-.176v-1.1a1 1 0 0 0-1.061-1 9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h.114a.251.251 0 0 0 .177-.073ZM23.707 1.706A1 1 0 0 0 22.293.292l-22 22a1 1 0 0 0 0 1.414l.009.009a1 1 0 0 0 1.405-.009l6.63-6.631A.251.251 0 0 1 8.515 17a.245.245 0 0 1 .177.075 10.081 10.081 0 0 0 6.5 2.92 1 1 0 0 0 1.061-1V9.266a.247.247 0 0 1 .073-.176Z"/>
                            </svg>
                        </button>
                        <input type="range" class="kg-video-volume-slider" max="100" value="100">
                    </div>
                </div>
            </div>
            <figcaption><p dir="ltr"><span style="white-space: pre-wrap;">A short video summary of the event with Dr. Woodruff and Cr Midgley talking to residents.</span></p></figcaption>
        </figure>]]></content:encoded></item><item><title><![CDATA[Hemlock in the morning, Human/Nature in the evening]]></title><description><![CDATA[<p>This Sunday was all about Landcare! Kicking off the morning with Whitewater Creek Landcare Group pulling weeds including thistle, forget-me-not and hemlock (toxic!). I got a bit of time in my own garden mulching the vegie garden with pea straw from Blackmans Bay&apos;s underground pea straw dealer.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/05/6.png" class="kg-image" alt loading="lazy" width="1500" height="1500" srcset="https://mark.id.au/content/images/size/w600/2026/05/6.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/6.png 1000w, https://mark.id.au/content/images/2026/05/6.png 1500w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Mark</span></figcaption></figure>]]></description><link>https://mark.id.au/hemlock-in-the-morning-human-nature-in-the-evening/</link><guid isPermaLink="false">6a12b3e51d66380001ab8764</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Sun, 24 May 2026 08:27:59 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/05/1.png" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/05/1.png" alt="Hemlock in the morning, Human/Nature in the evening"><p>This Sunday was all about Landcare! Kicking off the morning with Whitewater Creek Landcare Group pulling weeds including thistle, forget-me-not and hemlock (toxic!). I got a bit of time in my own garden mulching the vegie garden with pea straw from Blackmans Bay&apos;s underground pea straw dealer.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/05/6.png" class="kg-image" alt="Hemlock in the morning, Human/Nature in the evening" loading="lazy" width="1500" height="1500" srcset="https://mark.id.au/content/images/size/w600/2026/05/6.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/6.png 1000w, https://mark.id.au/content/images/2026/05/6.png 1500w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Mark Donnellon and Jill Jones, Biodiversity Officer for Kingborough Council</span></figcaption></figure><p>Then off to Nandroya Vineyard in Margate for a volunteers week celebration of our local Landcare volunteers. It was a great pleasure to catch up with many passionate people putting their energy in to conserving our natural environments. We all get a tremendous amount of work done, the vast majority of which is volunteer labour. Jill Jones, Biodiversity Officer for Kingborough Council, does a tremendous job facilitating the many local Landcare groups&apos; ability to work on council land. I&apos;m truly grateful for Jill&apos;s energy and for the council staffing someone for this role.</p><figure class="kg-card kg-gallery-card kg-width-wide"><div class="kg-gallery-container"><div class="kg-gallery-row"><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/05/2-1.png" width="1500" height="1500" loading="lazy" alt="Hemlock in the morning, Human/Nature in the evening" srcset="https://mark.id.au/content/images/size/w600/2026/05/2-1.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/2-1.png 1000w, https://mark.id.au/content/images/2026/05/2-1.png 1500w" sizes="(min-width: 720px) 720px"></div><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/05/5.png" width="1500" height="1500" loading="lazy" alt="Hemlock in the morning, Human/Nature in the evening" srcset="https://mark.id.au/content/images/size/w600/2026/05/5.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/5.png 1000w, https://mark.id.au/content/images/2026/05/5.png 1500w" sizes="(min-width: 720px) 720px"></div></div></div></figure><p>We were joined by a special guest, Jane Rawson, who gave a short talk in the mid-afternoon. Jane&apos;s a local author and environmentalist, with a background that includes a stint as environment and energy editor at The Conversation, travel writing for Lonely Planet, and a string of novels including the Aurealis-winning From the Wreck. These days she&apos;s managing editor at Island magazine and doing a PhD in creative writing at UTAS.</p><p></p><p>Jane and Jill talked about Jane&apos;s most recent book Human/Nature: On life in a wild world. It&apos;s a book that pokes at some of the unspoken assumptions underpinning Australian nature conservation. The idea of a pristine pre-human nature we can somehow get back to, the role of nostalgia in shaping what we choose to protect, and the awkward question of why we care so much about some species and not others.</p><p>Judging by Jane&apos;s quite amusing talk, I think I&apos;m going to enjoy reading her book!</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/05/3.png" class="kg-image" alt="Hemlock in the morning, Human/Nature in the evening" loading="lazy" width="1500" height="1500" srcset="https://mark.id.au/content/images/size/w600/2026/05/3.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/3.png 1000w, https://mark.id.au/content/images/2026/05/3.png 1500w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">One of the outlooks from the Nandroya Vineyard&apos;s cellar door.</span></figcaption></figure><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/05/4.png" class="kg-image" alt="Hemlock in the morning, Human/Nature in the evening" loading="lazy" width="1500" height="1500" srcset="https://mark.id.au/content/images/size/w600/2026/05/4.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/4.png 1000w, https://mark.id.au/content/images/2026/05/4.png 1500w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">One of the walls of the room was covered in collages that documented major improvements to areas supported by Landcare groups.</span></figcaption></figure>]]></content:encoded></item><item><title><![CDATA[Mother Goose baby store to close after 16 years]]></title><description><![CDATA[<figure class="kg-card kg-video-card kg-width-regular kg-card-hascaption" data-kg-thumbnail="https://mark.id.au/content/media/2026/05/VID_20260523_000415_585_bsl_thumb.jpg" data-kg-custom-thumbnail>
            <div class="kg-video-container">
                <video src="https://mark.id.au/content/media/2026/05/VID_20260523_000415_585_bsl.mp4" poster="https://img.spacergif.org/v1/720x1280/0a/spacer.png" width="720" height="1280" playsinline preload="metadata" style="background: transparent url(&apos;https://mark.id.au/content/media/2026/05/VID_20260523_000415_585_bsl_thumb.jpg&apos;) 50% 50% / cover no-repeat;"></video>
                <div class="kg-video-overlay">
                    <button class="kg-video-large-play-icon" aria-label="Play video">
                        <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                            <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                        </svg>
                    </button>
                </div>
                <div class="kg-video-player-container">
                    <div class="kg-video-player">
                        <button class="kg-video-play-icon" aria-label="Play video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-pause-icon kg-video-hide" aria-label="Pause video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <rect x="3" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                                <rect x="14" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                            </svg>
                        </button>
                        <span class="kg-video-current-time">0:00</span>
                        <div class="kg-video-time">
                            /<span class="kg-video-duration">1:13</span>
                        </div>
                        <input type="range" class="kg-video-seek-slider" max="100" value="0">
                        <button class="kg-video-playback-rate" aria-label="Adjust playback speed">1&#xD7;</button>
                        <button class="kg-video-unmute-icon" aria-label="Unmute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M15.189 2.021a9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h1.794a.249.249 0 0 1 .221.133 9.73 9.73 0 0 0 7.924 4.85h.06a1 1 0 0 0 1-1V3.02a1 1 0 0 0-1.06-.998Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-mute-icon kg-video-hide" aria-label="Mute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M16.177 4.3a.248.248 0 0 0 .073-.176v-1.1a1 1 0 0 0-1.061-1 9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h.114a.251.251 0 0 0 .177-.073ZM23.707 1.706A1 1 0 0 0 22.293.292l-22 22a1 1 0 0 0 0 1.414l.009.009a1 1 0 0 0 1.405-.009l6.63-6.631A.251.251 0 0 1 8.515 17a.245.245 0 0 1 .177.075 10.081 10.081 0 0 0 6.5 2.92 1 1 0 0 0 1.061-1V9.266a.247.247 0 0 1 .073-.176Z"/>
                            </svg>
                        </button>
                        <input type="range" class="kg-video-volume-slider" max="100" value="100">
                    </div>
                </div>
            </div>
            <figcaption><p dir="ltr"><span style="white-space: pre-wrap;">Mark talks about the closing of and his experience with the Mother Goose baby and toddler store</span></p></figcaption>
        </figure><p>Mother Goose is officially closing on the 20th of June.</p><p>Craig and Ali have run the shop for sixteen and a half years. It was one of</p>]]></description><link>https://mark.id.au/mother-goose-baby-store-to-close-after-16-years/</link><guid isPermaLink="false">6a1182e81d66380001ab8727</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Sat, 23 May 2026 23:00:40 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/05/PXL_20260523_040337038.jpg" medium="image"/><content:encoded><![CDATA[<figure class="kg-card kg-video-card kg-width-regular kg-card-hascaption" data-kg-thumbnail="https://mark.id.au/content/media/2026/05/VID_20260523_000415_585_bsl_thumb.jpg" data-kg-custom-thumbnail>
            <div class="kg-video-container">
                <video src="https://mark.id.au/content/media/2026/05/VID_20260523_000415_585_bsl.mp4" poster="https://img.spacergif.org/v1/720x1280/0a/spacer.png" width="720" height="1280" playsinline preload="metadata" style="background: transparent url(&apos;https://mark.id.au/content/media/2026/05/VID_20260523_000415_585_bsl_thumb.jpg&apos;) 50% 50% / cover no-repeat;"></video>
                <div class="kg-video-overlay">
                    <button class="kg-video-large-play-icon" aria-label="Play video">
                        <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                            <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                        </svg>
                    </button>
                </div>
                <div class="kg-video-player-container">
                    <div class="kg-video-player">
                        <button class="kg-video-play-icon" aria-label="Play video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M23.14 10.608 2.253.164A1.559 1.559 0 0 0 0 1.557v20.887a1.558 1.558 0 0 0 2.253 1.392L23.14 13.393a1.557 1.557 0 0 0 0-2.785Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-pause-icon kg-video-hide" aria-label="Pause video">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <rect x="3" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                                <rect x="14" y="1" width="7" height="22" rx="1.5" ry="1.5"/>
                            </svg>
                        </button>
                        <span class="kg-video-current-time">0:00</span>
                        <div class="kg-video-time">
                            /<span class="kg-video-duration">1:13</span>
                        </div>
                        <input type="range" class="kg-video-seek-slider" max="100" value="0">
                        <button class="kg-video-playback-rate" aria-label="Adjust playback speed">1&#xD7;</button>
                        <button class="kg-video-unmute-icon" aria-label="Unmute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M15.189 2.021a9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h1.794a.249.249 0 0 1 .221.133 9.73 9.73 0 0 0 7.924 4.85h.06a1 1 0 0 0 1-1V3.02a1 1 0 0 0-1.06-.998Z"/>
                            </svg>
                        </button>
                        <button class="kg-video-mute-icon kg-video-hide" aria-label="Mute">
                            <svg xmlns="http://www.w3.org/2000/svg" viewbox="0 0 24 24">
                                <path d="M16.177 4.3a.248.248 0 0 0 .073-.176v-1.1a1 1 0 0 0-1.061-1 9.728 9.728 0 0 0-7.924 4.85.249.249 0 0 1-.221.133H5.25a3 3 0 0 0-3 3v2a3 3 0 0 0 3 3h.114a.251.251 0 0 0 .177-.073ZM23.707 1.706A1 1 0 0 0 22.293.292l-22 22a1 1 0 0 0 0 1.414l.009.009a1 1 0 0 0 1.405-.009l6.63-6.631A.251.251 0 0 1 8.515 17a.245.245 0 0 1 .177.075 10.081 10.081 0 0 0 6.5 2.92 1 1 0 0 0 1.061-1V9.266a.247.247 0 0 1 .073-.176Z"/>
                            </svg>
                        </button>
                        <input type="range" class="kg-video-volume-slider" max="100" value="100">
                    </div>
                </div>
            </div>
            <figcaption><img src="https://mark.id.au/content/images/2026/05/PXL_20260523_040337038.jpg" alt="Mother Goose baby store to close after 16 years"><p dir="ltr"><span style="white-space: pre-wrap;">Mark talks about the closing of and his experience with the Mother Goose baby and toddler store</span></p></figcaption>
        </figure><p>Mother Goose is officially closing on the 20th of June.</p><p>Craig and Ali have run the shop for sixteen and a half years. It was one of the first businesses in Australia certified to install child seats, and they take safety seriously. Only stocking seats with top safety ratings, and offering free certified fittings and re-fittings.</p><p>When my wife and I had our first daughter, Craig and Ali&apos;s team were there to help us choose the right equipment for our lifestyle and safely secure her seat before my wife gave birth.</p><p>Mother Goose has also been a great source of quality gifts for the many young kids born to my friends in recent years.</p><p>Craig tells me one of the things that&apos;s made business harder is the large national chains buying entire brands to become the sole stockist, removing product lines from independent stores.</p><p>Mother Goose is the last baby shop standing in Kingborough. Soon there will be none.</p><p>Kingborough is a place where many people start their family. My whole extended family has greatly valued the personal, high quality service Mother Goose has offered over the years, and we&apos;re deeply saddened to see this small local business squeezed out of the market. I feel for the Mother Goose team, and for all the new families in Kingborough who&apos;ll no longer have their service to support them.</p>]]></content:encoded></item><item><title><![CDATA[More Airbnb, Less Homes]]></title><description><![CDATA[<p>For a few years on McDonald&apos;s wages, three of us shared a two-bedroom flat in Kingston Beach. Housing like that is a core need for young people getting a foothold on life. It&apos;s exactly what disappears when small units become Airbnbs.</p><p>There&apos;s a development</p>]]></description><link>https://mark.id.au/more-airbnb-less-homes/</link><guid isPermaLink="false">6a11697d1d66380001ab86d0</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Sat, 23 May 2026 09:08:20 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/05/image-1.png" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/05/image-1.png" alt="More Airbnb, Less Homes"><p>For a few years on McDonald&apos;s wages, three of us shared a two-bedroom flat in Kingston Beach. Housing like that is a core need for young people getting a foothold on life. It&apos;s exactly what disappears when small units become Airbnbs.</p><p>There&apos;s a development application on public notice right now: <a href="https://www.kingborough.tas.gov.au/development/planning-notices/?ref=mark.id.au">DA-2026-120, Unit 2/26 Osborne Esplanade, Kingston Beach</a>. A 48sqm one-bedder, proposed to convert from residential to visitor accommodation. Two guests, listed on Airbnb. One flat. One less rental on the market.</p><figure class="kg-card kg-image-card"><img src="https://mark.id.au/content/images/2026/05/image2.png" class="kg-image" alt="More Airbnb, Less Homes" loading="lazy" width="2000" height="1416" srcset="https://mark.id.au/content/images/size/w600/2026/05/image2.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/image2.png 1000w, https://mark.id.au/content/images/size/w1600/2026/05/image2.png 1600w, https://mark.id.au/content/images/2026/05/image2.png 2236w" sizes="(min-width: 720px) 720px"></figure><p>The <a href="https://www.abc.net.au/news/2026-05-14/tas-short-stay-accommodation-increases/106674936?ref=mark.id.au">ABC reported last week</a> that Tasmania added 498 whole-home short stays in just over 12 months. The statewide total is now 4,719. Kingborough alone has 722 short-stay premises in Q1 2026, fifth in the state behind Hobart, Launceston, Clarence and Glamorgan-Spring Bay.</p><p>Emeritus Prof Peter Phibbs told the ABC that whole-home short stays now sit at around 8% of Tasmania&apos;s long-term rental market. Probably double what Melbourne or Sydney are seeing. Hobart Lord Mayor Anna Reynolds was blunt: &quot;It is really concerning how many rental properties we are losing to the short-stay market.&quot;</p><p>Meanwhile <a href="https://tascoss.org.au/state-of-housing/indicators/?ref=mark.id.au">the social housing waitlist sits at 5,097</a>. Priority applicants wait 81 months.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/05/image-2.png" class="kg-image" alt="More Airbnb, Less Homes" loading="lazy" width="887" height="777" srcset="https://mark.id.au/content/images/size/w600/2026/05/image-2.png 600w, https://mark.id.au/content/images/2026/05/image-2.png 887w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">A chart from the TasCOSS State of Housing Dashboard showing social housing applicants by region and number of bedrooms requested. Southern Tasmania showing almost 1500 applicants are waiting for single bedroom housing out of 2487. Data source:&#xA0;</span><a href="https://www.parliament.tas.gov.au/__data/assets/pdf_file/0032/99644/HA-Estimates-Committee-A-Tuesday-18-November-2025-Vincent.pdf?ref=mark.id.au" target="_blank"><span style="white-space: pre-wrap;">Eleri Morgan-Thomas, Estimates Committee A, Hon. Kerry A. Vincent MLC, House of Assembly, Parliament of Tasmania, 18 Nov 2025</span></a></figcaption></figure><p>The 5% short-stay levy passed the lower house last Friday and is now in the upper house. Worth doing. But a levy doesn&apos;t bring a single unit back.</p><p>Planning permits are the actual lever. This application is discretionary, which means <a href="https://www.kingborough.tas.gov.au/?ref=mark.id.au">Kingborough Council</a> can refuse it on grounds like residential character, parking adequacy, or the cumulative impact of similar uses in the area. (And it&apos;s worth noting the applicant&apos;s own visitor management plan contradicts itself: the guest cap says two people, but the car parking section mentions &quot;a maximum of four guests.&quot; Councils notice that kind of thing when locals put it on the record.) They only exercise that discretion when the community makes representations. No reps, no refusal.</p><p>Reps close 2 June. Email <a href="mailto:kc@kingborough.tas.gov.au">kc@kingborough.tas.gov.au</a> and quote DA-2026-120.</p>]]></content:encoded></item><item><title><![CDATA[The Margate bridge is dangerous. The budget is in two weeks. Time to act.]]></title><description><![CDATA[<p>The North West Bay River bridge on Channel Highway has no safe crossing for pedestrians or cyclists. Trucks pass within arm&apos;s reach. There&apos;s no barrier. That&apos;s the reality for anyone walking or riding through Margate right now.</p><p>I&apos;ve lived in Huntingfield for</p>]]></description><link>https://mark.id.au/the-margate-bridge-is-dangerous-the-budget-is-in-two-weeks-time-to-act/</link><guid isPermaLink="false">69fb25bb1d66380001ab8426</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Wed, 06 May 2026 11:54:16 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/05/PXL_20260504_004500308-EDIT.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/05/PXL_20260504_004500308-EDIT.jpg" alt="The Margate bridge is dangerous. The budget is in two weeks. Time to act."><p>The North West Bay River bridge on Channel Highway has no safe crossing for pedestrians or cyclists. Trucks pass within arm&apos;s reach. There&apos;s no barrier. That&apos;s the reality for anyone walking or riding through Margate right now.</p><p>I&apos;ve lived in Huntingfield for six years. My family can&apos;t walk or ride the 5km to the Margate Tavern, Brookfield, or the Margate Train. Not because it&apos;s too far. Because the bridge and the highway are genuinely dangerous. In the other direction there&apos;s at least footpaths or tracks all the way to Kingston and Blackmans Bay. The contrast is hard to ignore.</p><figure class="kg-card kg-image-card"><img src="https://mark.id.au/content/images/2026/05/PXL_20260504_004648048--1-.jpg" class="kg-image" alt="The Margate bridge is dangerous. The budget is in two weeks. Time to act." loading="lazy" width="2000" height="1500" srcset="https://mark.id.au/content/images/size/w600/2026/05/PXL_20260504_004648048--1-.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/05/PXL_20260504_004648048--1-.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/05/PXL_20260504_004648048--1-.jpg 1600w, https://mark.id.au/content/images/2026/05/PXL_20260504_004648048--1-.jpg 2281w" sizes="(min-width: 720px) 720px"></figure><p>Eight local residents have had enough. Roz Thurn, Don Stewart, Morris Worsley, Angela Brinkhoff, Jane Mole, Cam McFarlane, Ben Brinkhoff and Anne Briggs have been actively campaigning for a safe crossing. Don wrote to Infrastructure Minister Kerry Vincent in April, laying it out plainly: the bridge doesn&apos;t meet Australian design standards, the narrow ledge is barely walkable, and lowers the already inadequate barrier preventing a fall into the river. It&apos;s only a matter of time before someone gets seriously hurt.</p><p>This week, Kingborough Council unanimously passed a motion recognising the Margate to Huntingfield Shared Path as a high-priority infrastructure project and committing to advocate to state and federal governments for funding. Good. That&apos;s the right call.</p><p>But the bridge sits on a state growth road. The state government owns this problem. Council can and should advocate, but Minister Vincent&apos;s department needs to deliver the fix.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/05/image.png" class="kg-image" alt="The Margate bridge is dangerous. The budget is in two weeks. Time to act." loading="lazy" width="1022" height="953" srcset="https://mark.id.au/content/images/size/w600/2026/05/image.png 600w, https://mark.id.au/content/images/size/w1000/2026/05/image.png 1000w, https://mark.id.au/content/images/2026/05/image.png 1022w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Existing vs proposed section design of Channel Highway in the Margate Mainstreet Master Plan by Realm Studios</span></figcaption></figure><p>This project has been crawling along for over six years. Realm Studios&apos; 2024 Margate Mainstreet Master Plan calls for wide shared mobility paths as part of a broader vision for commercial and residential growth. Margate is growing. Making that growth car-dependent is a bad outcome for everyone.</p><div class="kg-card kg-file-card"><a class="kg-file-card-container" href="https://mark.id.au/content/files/2026/05/Margate-Main-Street-Masterplan_2024.pdf" title="Download" download><div class="kg-file-card-contents"><div class="kg-file-card-title">Margate-Main-Street-Masterplan_2024</div><div class="kg-file-card-caption"></div><div class="kg-file-card-metadata"><div class="kg-file-card-filename">Margate-Main-Street-Masterplan_2024.pdf</div><div class="kg-file-card-filesize">39 MB</div></div></div><div class="kg-file-card-icon"><svg viewbox="0 0 24 24"><defs><style>.a{fill:none;stroke:currentColor;stroke-linecap:round;stroke-linejoin:round;stroke-width:1.5px;}</style></defs><title>download-circle</title><polyline class="a" points="8.25 14.25 12 18 15.75 14.25"/><line class="a" x1="12" y1="6.75" x2="12" y2="18"/><circle class="a" cx="12" cy="12" r="11.25"/></svg></div></a></div><p>People of all shapes, ages and fitness levels want to walk and ride to the Kingborough Bowls Club, Hopfields Brewery, the Margate Train, Inverawe Native Gardens. Right now, only the bold are doing it, alongside heavy vehicles with no separation. That&apos;s not good enough for a growing community.</p><p>The 2026&#x2013;27 state budget is handed down on 21 May. That&apos;s two weeks away.</p><p>If you want to see this project funded, now is the time to say so. Contact Minister Kerry Vincent (Infrastructure and Transport) and Treasurer Eric Abetz and ask them to set aside funding for the Margate to Huntingfield Shared Path in this budget.</p><p>Kerry Vincent: <a>kerry.vincent@parliament.tas.gov.au</a><br>Eric Abetz: <a>eric.abetz@dpac.tas.gov.au</a></p>]]></content:encoded></item><item><title><![CDATA[Huntingfield's Unique Design from the 1980's]]></title><description><![CDATA[<p>The 1980&apos;s section of Huntingfield has a remarkable design compared to what gets built with today&apos;s typical urban sprawl! </p><p>The narrow streets may provide limited parking space, but narrow streets keep traffic speeds slower, quieter and safer, providing a far more enjoyable space. Being significantly safer</p>]]></description><link>https://mark.id.au/huntingfields-unique-design-from-the-1980s/</link><guid isPermaLink="false">69abd1541d66380001ab83ea</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Sat, 07 Mar 2026 08:00:54 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/03/PXL_20260307_033743524.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/03/PXL_20260307_033743524.jpg" alt="Huntingfield&apos;s Unique Design from the 1980&apos;s"><p>The 1980&apos;s section of Huntingfield has a remarkable design compared to what gets built with today&apos;s typical urban sprawl! </p><p>The narrow streets may provide limited parking space, but narrow streets keep traffic speeds slower, quieter and safer, providing a far more enjoyable space. Being significantly safer than fast, wide roads with on street parking, the outdoor space can be used for more purposes including our kids playing or walking and riding to school!</p><p>Talking to someone who closely followed the development back in the 80s, it was apparently &quot;high density&quot; and significant consideration was given to its design to make the density liveable and foster community between the residents. Much more development of the suburb was intended at the time, however the demand for housing was not there and development further towards where the schools are now did not go ahead.</p><p>40 years later, the state government still owns the land, and is finally building out a new stage of Huntingfield. Let&apos;s hope the design delivers similar qualities for the new residents of Huntingfield.</p><figure class="kg-card kg-gallery-card kg-width-wide"><div class="kg-gallery-container"><div class="kg-gallery-row"><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/03/PXL_20260307_031529807.jpg" width="2000" height="1502" loading="lazy" alt="Huntingfield&apos;s Unique Design from the 1980&apos;s" srcset="https://mark.id.au/content/images/size/w600/2026/03/PXL_20260307_031529807.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/03/PXL_20260307_031529807.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/03/PXL_20260307_031529807.jpg 1600w, https://mark.id.au/content/images/size/w2400/2026/03/PXL_20260307_031529807.jpg 2400w" sizes="(min-width: 720px) 720px"></div><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/03/PXL_20260307_032109562.jpg" width="2000" height="1502" loading="lazy" alt="Huntingfield&apos;s Unique Design from the 1980&apos;s" srcset="https://mark.id.au/content/images/size/w600/2026/03/PXL_20260307_032109562.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/03/PXL_20260307_032109562.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/03/PXL_20260307_032109562.jpg 1600w, https://mark.id.au/content/images/size/w2400/2026/03/PXL_20260307_032109562.jpg 2400w" sizes="(min-width: 720px) 720px"></div></div><div class="kg-gallery-row"><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/03/PXL_20260307_032120564.jpg" width="2000" height="1502" loading="lazy" alt="Huntingfield&apos;s Unique Design from the 1980&apos;s" srcset="https://mark.id.au/content/images/size/w600/2026/03/PXL_20260307_032120564.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/03/PXL_20260307_032120564.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/03/PXL_20260307_032120564.jpg 1600w, https://mark.id.au/content/images/size/w2400/2026/03/PXL_20260307_032120564.jpg 2400w" sizes="(min-width: 720px) 720px"></div><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2026/03/PXL_20260307_033817334.jpg" width="2000" height="1502" loading="lazy" alt="Huntingfield&apos;s Unique Design from the 1980&apos;s" srcset="https://mark.id.au/content/images/size/w600/2026/03/PXL_20260307_033817334.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/03/PXL_20260307_033817334.jpg 1000w, https://mark.id.au/content/images/size/w1600/2026/03/PXL_20260307_033817334.jpg 1600w, https://mark.id.au/content/images/size/w2400/2026/03/PXL_20260307_033817334.jpg 2400w" sizes="(min-width: 720px) 720px"></div></div></div></figure>]]></content:encoded></item><item><title><![CDATA[Two big submissions for Streets People Love Hobart]]></title><description><![CDATA[<p>I&apos;m blown away by the volunteer effort put in to two great submissions championing people-centric design and active transport this past weekend! Each one took tens of person hours to complete on top of the writers&apos; prior knowledge of good design and government policies built over years</p>]]></description><link>https://mark.id.au/two-big-submissions-for-streets-people-love-hobart/</link><guid isPermaLink="false">699aa8341d66380001ab8380</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Mon, 23 Feb 2026 00:00:23 GMT</pubDate><media:content url="https://mark.id.au/content/images/2026/02/Untitled.png" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2026/02/Untitled.png" alt="Two big submissions for Streets People Love Hobart"><p>I&apos;m blown away by the volunteer effort put in to two great submissions championing people-centric design and active transport this past weekend! Each one took tens of person hours to complete on top of the writers&apos; prior knowledge of good design and government policies built over years of engagement in advocacy. </p><p>Streets People Love Hobart made comprehensive submissions to the government consultations for the Draft Southern Tasmania Regional Land Use Strategy and the Macquarie Point Northern Access Road. You can find out what they said on the Streets People Love Hobart website.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/02/3f8351342c43e3bdacfaa43a6bbf2d6d.png" class="kg-image" alt="Two big submissions for Streets People Love Hobart" loading="lazy" width="862" height="485" srcset="https://mark.id.au/content/images/size/w600/2026/02/3f8351342c43e3bdacfaa43a6bbf2d6d.png 600w, https://mark.id.au/content/images/2026/02/3f8351342c43e3bdacfaa43a6bbf2d6d.png 862w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">2021 saw the announcement of plans for medium density development at Macquarie Point. </span></figcaption></figure><h3 id="southern-tasmania-regional-land-use-strategy"><strong>Southern Tasmania Regional Land Use Strategy</strong></h3><p>The STRLUS will shape how southern Tasmania grows through to 2050. Our submission, prepared by Ben and Penelope Clark, argued that the strategy needs to back up its own rhetoric. It talks about compact settlements and reducing car dependence &#x2014; but the previous Planning Minister&apos;s decision to extend the Urban Growth Boundary for up to 9,700 new lots in places like Margate, Brighton and Sorell pulls in the opposite direction. That&apos;s sprawl, not infill, and it locks in the car-dependent development pattern the strategy says it wants to avoid.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2026/02/gEEw3QO8iz.png" class="kg-image" alt="Two big submissions for Streets People Love Hobart" loading="lazy" width="2000" height="1438" srcset="https://mark.id.au/content/images/size/w600/2026/02/gEEw3QO8iz.png 600w, https://mark.id.au/content/images/size/w1000/2026/02/gEEw3QO8iz.png 1000w, https://mark.id.au/content/images/size/w1600/2026/02/gEEw3QO8iz.png 1600w, https://mark.id.au/content/images/2026/02/gEEw3QO8iz.png 2227w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">The Greater Hobart Cycling Plan seemed to have been forgotten in the draft STRLUS.</span></figcaption></figure><p>We pushed for urban consolidation to be elevated as a priority, not listed as the last option. We called out the massive funding imbalance &#x2014; $2.2 billion for roads over the past decade versus $17.5 million for active transport &#x2014; and argued the STRLUS should require capital projects to be assessed against its own objectives. If the government is serious about the vision in the Wellbeing Framework, the Walk Wheel Ride Strategy, and the Preventive Health Strategy, the land use strategy needs to actually deliver on it.</p><figure class="kg-card kg-bookmark-card kg-card-hascaption"><a class="kg-bookmark-container" href="https://streetspeoplelovehobart.au/p/be2f7327-b864-4b2f-93ff-c8b28994491b/?ref=mark.id.au"><div class="kg-bookmark-content"><div class="kg-bookmark-title">Submission to Draft Southern Tasmanian Regional Land Use Strategy</div><div class="kg-bookmark-description">Southern Tasmania&#x2019;s next 25 years are being planned right now. We&#x2019;ve had our say.</div><div class="kg-bookmark-metadata"><img class="kg-bookmark-icon" src="https://streetspeoplelovehobart.au/content/images/size/w256h256/2025/05/perci-bg-removed.png" alt="Two big submissions for Streets People Love Hobart"><span class="kg-bookmark-author">Streets People Love Hobart</span><span class="kg-bookmark-publisher">Mark Donnellon</span></div></div><div class="kg-bookmark-thumbnail"><img src="https://streetspeoplelovehobart.au/content/images/size/w1200/2026/02/SouthernTasmaniaBanner.png" alt="Two big submissions for Streets People Love Hobart"></div></a><figcaption><p dir="ltr"><span style="white-space: pre-wrap;">Find out more about the STRLUS submission!</span></p></figcaption></figure><figure class="kg-card kg-image-card"><img src="https://mark.id.au/content/images/2026/02/Picture1.jpg" class="kg-image" alt="Two big submissions for Streets People Love Hobart" loading="lazy" width="1384" height="406" srcset="https://mark.id.au/content/images/size/w600/2026/02/Picture1.jpg 600w, https://mark.id.au/content/images/size/w1000/2026/02/Picture1.jpg 1000w, https://mark.id.au/content/images/2026/02/Picture1.jpg 1384w" sizes="(min-width: 720px) 720px"></figure><h3 id="macquarie-point-northern-access-road"><strong>Macquarie Point Northern Access Road</strong></h3><p>The Northern Access Road will service the Port of Hobart and provide a bus plaza for the new stadium precinct. It also cuts right through the Intercity Cycleway &#x2014; the busiest walking and cycling route in the city. We made two submissions on this project, prepared by Dominic Lang and other SPLH members, as well as a submission and in-person evidence to the Parliamentary Standing Committee on Public Works.</p><figure class="kg-card kg-image-card"><img src="https://mark.id.au/content/images/2026/02/Picture3.png" class="kg-image" alt="Two big submissions for Streets People Love Hobart" loading="lazy" width="1299" height="371" srcset="https://mark.id.au/content/images/size/w600/2026/02/Picture3.png 600w, https://mark.id.au/content/images/size/w1000/2026/02/Picture3.png 1000w, https://mark.id.au/content/images/2026/02/Picture3.png 1299w" sizes="(min-width: 720px) 720px"></figure><p>Our key concern is that the concept design treats active transport as an afterthought. We used satellite imagery to show desire lines worn into the grass where people are already taking shortcuts the design ignores. We called for separated paths for walking and riding, safer intersection designs, 30 km/h traffic speeds, and proper connections between the cycleway, the Domain, and the future ferry terminal. The stadium&apos;s own transport study expects 25% of patrons to walk or ride &#x2014; the road design needs to reflect that reality.</p><figure class="kg-card kg-bookmark-card kg-card-hascaption"><a class="kg-bookmark-container" href="https://streetspeoplelovehobart.au/p/63899b6f-9a8b-478b-9f87-c2142d867255/?ref=mark.id.au"><div class="kg-bookmark-content"><div class="kg-bookmark-title">Submission to Macquarie Point Northern Access Road Consultation</div><div class="kg-bookmark-description">A new road is being built to service the Port of Hobart and the stadium precinct. We&#x2019;ve been fighting to make sure it doesn&#x2019;t forget the thousands of people who will walk and ride through this corridor every day.</div><div class="kg-bookmark-metadata"><img class="kg-bookmark-icon" src="https://streetspeoplelovehobart.au/content/images/size/w256h256/2025/05/perci-bg-removed.png" alt="Two big submissions for Streets People Love Hobart"><span class="kg-bookmark-author">Streets People Love Hobart</span><span class="kg-bookmark-publisher">Mark Donnellon</span></div></div><div class="kg-bookmark-thumbnail"><img src="https://streetspeoplelovehobart.au/content/images/2026/02/stadium-event-bus-routes.png" alt="Two big submissions for Streets People Love Hobart"></div></a><figcaption><p dir="ltr"><span style="white-space: pre-wrap;">Find out more about the Macquarie Point Northern Access Road submission!</span></p></figcaption></figure>]]></content:encoded></item><item><title><![CDATA[Water on the roads at Kingston Beach]]></title><description><![CDATA[<p>The roads of Kingston Beach have received a unique treatment for the Kingborough area. Have you seen something like this elsewhere in greater Hobart?</p><figure class="kg-card kg-gallery-card kg-width-wide kg-card-hascaption"><div class="kg-gallery-container"><div class="kg-gallery-row"><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2025/12/1000010210.jpg" width="2000" height="1502" loading="lazy" alt srcset="https://mark.id.au/content/images/size/w600/2025/12/1000010210.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/12/1000010210.jpg 1000w, https://mark.id.au/content/images/size/w1600/2025/12/1000010210.jpg 1600w, https://mark.id.au/content/images/size/w2400/2025/12/1000010210.jpg 2400w" sizes="(min-width: 720px) 720px"></div><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2025/12/1000010215.jpg" width="2000" height="1502" loading="lazy" alt srcset="https://mark.id.au/content/images/size/w600/2025/12/1000010215.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/12/1000010215.jpg 1000w, https://mark.id.au/content/images/size/w1600/2025/12/1000010215.jpg 1600w, https://mark.id.au/content/images/size/w2400/2025/12/1000010215.jpg 2400w" sizes="(min-width: 720px) 720px"></div></div></div><figcaption><p dir="ltr"><span style="white-space: pre-wrap;">Kingston Beach will also have new wombat crossings and curb extensions. The curb extensions shown here will be combined with a yet to be installed Blue</span></p></figcaption></figure>]]></description><link>https://mark.id.au/water-on-the-roads-at-kingston-beach/</link><guid isPermaLink="false">693cf685c89d810001c1b491</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Sat, 13 Dec 2025 05:22:25 GMT</pubDate><media:content url="https://mark.id.au/content/images/2025/12/1000010213.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2025/12/1000010213.jpg" alt="Water on the roads at Kingston Beach"><p>The roads of Kingston Beach have received a unique treatment for the Kingborough area. Have you seen something like this elsewhere in greater Hobart?</p><figure class="kg-card kg-gallery-card kg-width-wide kg-card-hascaption"><div class="kg-gallery-container"><div class="kg-gallery-row"><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2025/12/1000010210.jpg" width="2000" height="1502" loading="lazy" alt="Water on the roads at Kingston Beach" srcset="https://mark.id.au/content/images/size/w600/2025/12/1000010210.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/12/1000010210.jpg 1000w, https://mark.id.au/content/images/size/w1600/2025/12/1000010210.jpg 1600w, https://mark.id.au/content/images/size/w2400/2025/12/1000010210.jpg 2400w" sizes="(min-width: 720px) 720px"></div><div class="kg-gallery-image"><img src="https://mark.id.au/content/images/2025/12/1000010215.jpg" width="2000" height="1502" loading="lazy" alt="Water on the roads at Kingston Beach" srcset="https://mark.id.au/content/images/size/w600/2025/12/1000010215.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/12/1000010215.jpg 1000w, https://mark.id.au/content/images/size/w1600/2025/12/1000010215.jpg 1600w, https://mark.id.au/content/images/size/w2400/2025/12/1000010215.jpg 2400w" sizes="(min-width: 720px) 720px"></div></div></div><figcaption><p dir="ltr"><span style="white-space: pre-wrap;">Kingston Beach will also have new wombat crossings and curb extensions. The curb extensions shown here will be combined with a yet to be installed Blue road treatment to make crossing the road outside Kingston Beach Early Learning centre safer.</span></p></figcaption></figure><p>Kingston Beach is a very high pedestrian activity area, with several popular restaurants, cafes and shops, a gym and the Kingston Beach hall. It is also a popular area for recreational cycling and running.</p><p>&quot;The traffic calming measures [...] will provide a strong indication to motorists to change their driving behaviour to match the change in the road environment. They have been carefully located and spaced to achieve slower traffic speeds and safer pedestrian environment.&quot;</p>]]></content:encoded></item><item><title><![CDATA[Christmas Pageant - Next Weekend!]]></title><description><![CDATA[<p>The team at Streets People Love Hobart are gearing up for the City of Hobart Christmas Pageant, but we could use more people!</p><p>Walk, ride or skate, you can help us show Hobart the different ways people get around. We&apos;ll have people rollin&apos; on cargo bikes, recumbents,</p>]]></description><link>https://mark.id.au/christmas-pageant-next-weekend/</link><guid isPermaLink="false">691470332275420001ee8f23</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Wed, 12 Nov 2025 11:33:35 GMT</pubDate><media:content url="https://mark.id.au/content/images/2025/11/IMG-20251109-WA0005.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2025/11/IMG-20251109-WA0005.jpg" alt="Christmas Pageant - Next Weekend!"><p>The team at Streets People Love Hobart are gearing up for the City of Hobart Christmas Pageant, but we could use more people!</p><p>Walk, ride or skate, you can help us show Hobart the different ways people get around. We&apos;ll have people rollin&apos; on cargo bikes, recumbents, scooters, skateboards and prams, there&apos;ll even be people using their feet! &#x1FAE8; </p><p>fr though, we could use some people walking to assist with carrying our huge platypus sculpture! We&apos;ve got some special gifts planned for those who come along! </p><p><a href="https://docs.google.com/forms/d/e/1FAIpQLSdR8ohJga7zooTYZEwPE0xxU2bh7oytGefDCxQ9ZaIJShiDTw/viewform?ref=mark.id.au" rel="noreferrer">&#x1F449;&#x1F449; Sign up &#x1F448;&#x1F448;</a> so we know how many we&apos;ve got and we can send you important information like where and when to meet!</p><p>Saturday 22nd November, gather from 9:30am (exactly where not confirmed!), 10:30am pageant moves, 12:00pm post-pageant hang out.</p>
<!--kg-card-begin: html-->
<blockquote class="instagram-media" data-instgrm-captioned data-instgrm-permalink="https://www.instagram.com/reel/DQ9CBDwjXGF/?utm_source=ig_embed&amp;utm_campaign=loading" data-instgrm-version="14" style=" background:#FFF; border:0; border-radius:3px; box-shadow:0 0 1px 0 rgba(0,0,0,0.5),0 1px 10px 0 rgba(0,0,0,0.15); margin: 1px; max-width:540px; min-width:326px; padding:0; width:99.375%; width:-webkit-calc(100% - 2px); width:calc(100% - 2px);"><div style="padding:16px;"> <a href="https://www.instagram.com/reel/DQ9CBDwjXGF/?utm_source=ig_embed&amp;utm_campaign=loading" style=" background:#FFFFFF; line-height:0; padding:0 0; text-align:center; text-decoration:none; width:100%;" target="_blank"> <div style=" display: flex; flex-direction: row; align-items: center;"> <div style="background-color: #F4F4F4; border-radius: 50%; flex-grow: 0; height: 40px; margin-right: 14px; width: 40px;"></div> <div style="display: flex; flex-direction: column; flex-grow: 1; justify-content: center;"> <div style=" background-color: #F4F4F4; border-radius: 4px; flex-grow: 0; height: 14px; margin-bottom: 6px; width: 100px;"></div> <div style=" background-color: #F4F4F4; border-radius: 4px; flex-grow: 0; height: 14px; width: 60px;"></div></div></div><div style="padding: 19% 0;"></div> <div style="display:block; height:50px; margin:0 auto 12px; width:50px;"><svg width="50px" height="50px" viewbox="0 0 60 60" version="1.1" xmlns="https://www.w3.org/2000/svg" xmlns:xlink="https://www.w3.org/1999/xlink"><g stroke="none" stroke-width="1" fill="none" fill-rule="evenodd"><g transform="translate(-511.000000, -20.000000)" fill="#000000"><g><path d="M556.869,30.41 C554.814,30.41 553.148,32.076 553.148,34.131 C553.148,36.186 554.814,37.852 556.869,37.852 C558.924,37.852 560.59,36.186 560.59,34.131 C560.59,32.076 558.924,30.41 556.869,30.41 M541,60.657 C535.114,60.657 530.342,55.887 530.342,50 C530.342,44.114 535.114,39.342 541,39.342 C546.887,39.342 551.658,44.114 551.658,50 C551.658,55.887 546.887,60.657 541,60.657 M541,33.886 C532.1,33.886 524.886,41.1 524.886,50 C524.886,58.899 532.1,66.113 541,66.113 C549.9,66.113 557.115,58.899 557.115,50 C557.115,41.1 549.9,33.886 541,33.886 M565.378,62.101 C565.244,65.022 564.756,66.606 564.346,67.663 C563.803,69.06 563.154,70.057 562.106,71.106 C561.058,72.155 560.06,72.803 558.662,73.347 C557.607,73.757 556.021,74.244 553.102,74.378 C549.944,74.521 548.997,74.552 541,74.552 C533.003,74.552 532.056,74.521 528.898,74.378 C525.979,74.244 524.393,73.757 523.338,73.347 C521.94,72.803 520.942,72.155 519.894,71.106 C518.846,70.057 518.197,69.06 517.654,67.663 C517.244,66.606 516.755,65.022 516.623,62.101 C516.479,58.943 516.448,57.996 516.448,50 C516.448,42.003 516.479,41.056 516.623,37.899 C516.755,34.978 517.244,33.391 517.654,32.338 C518.197,30.938 518.846,29.942 519.894,28.894 C520.942,27.846 521.94,27.196 523.338,26.654 C524.393,26.244 525.979,25.756 528.898,25.623 C532.057,25.479 533.004,25.448 541,25.448 C548.997,25.448 549.943,25.479 553.102,25.623 C556.021,25.756 557.607,26.244 558.662,26.654 C560.06,27.196 561.058,27.846 562.106,28.894 C563.154,29.942 563.803,30.938 564.346,32.338 C564.756,33.391 565.244,34.978 565.378,37.899 C565.522,41.056 565.552,42.003 565.552,50 C565.552,57.996 565.522,58.943 565.378,62.101 M570.82,37.631 C570.674,34.438 570.167,32.258 569.425,30.349 C568.659,28.377 567.633,26.702 565.965,25.035 C564.297,23.368 562.623,22.342 560.652,21.575 C558.743,20.834 556.562,20.326 553.369,20.18 C550.169,20.033 549.148,20 541,20 C532.853,20 531.831,20.033 528.631,20.18 C525.438,20.326 523.257,20.834 521.349,21.575 C519.376,22.342 517.703,23.368 516.035,25.035 C514.368,26.702 513.342,28.377 512.574,30.349 C511.834,32.258 511.326,34.438 511.181,37.631 C511.035,40.831 511,41.851 511,50 C511,58.147 511.035,59.17 511.181,62.369 C511.326,65.562 511.834,67.743 512.574,69.651 C513.342,71.625 514.368,73.296 516.035,74.965 C517.703,76.634 519.376,77.658 521.349,78.425 C523.257,79.167 525.438,79.673 528.631,79.82 C531.831,79.965 532.853,80.001 541,80.001 C549.148,80.001 550.169,79.965 553.369,79.82 C556.562,79.673 558.743,79.167 560.652,78.425 C562.623,77.658 564.297,76.634 565.965,74.965 C567.633,73.296 568.659,71.625 569.425,69.651 C570.167,67.743 570.674,65.562 570.82,62.369 C570.966,59.17 571,58.147 571,50 C571,41.851 570.966,40.831 570.82,37.631"/></g></g></g></svg></div><div style="padding-top: 8px;"> <div style=" color:#3897f0; font-family:Arial,sans-serif; font-size:14px; font-style:normal; font-weight:550; line-height:18px;">View this post on Instagram</div></div><div style="padding: 12.5% 0;"></div> <div style="display: flex; flex-direction: row; margin-bottom: 14px; align-items: center;"><div> <div style="background-color: #F4F4F4; border-radius: 50%; height: 12.5px; width: 12.5px; transform: translateX(0px) translateY(7px);"></div> <div style="background-color: #F4F4F4; height: 12.5px; transform: rotate(-45deg) translateX(3px) translateY(1px); width: 12.5px; flex-grow: 0; margin-right: 14px; margin-left: 2px;"></div> <div style="background-color: #F4F4F4; border-radius: 50%; height: 12.5px; width: 12.5px; transform: translateX(9px) translateY(-18px);"></div></div><div style="margin-left: 8px;"> <div style=" background-color: #F4F4F4; border-radius: 50%; flex-grow: 0; height: 20px; width: 20px;"></div> <div style=" width: 0; height: 0; border-top: 2px solid transparent; border-left: 6px solid #f4f4f4; border-bottom: 2px solid transparent; transform: translateX(16px) translateY(-4px) rotate(30deg)"></div></div><div style="margin-left: auto;"> <div style=" width: 0px; border-top: 8px solid #F4F4F4; border-right: 8px solid transparent; transform: translateY(16px);"></div> <div style=" background-color: #F4F4F4; flex-grow: 0; height: 12px; width: 16px; transform: translateY(-4px);"></div> <div style=" width: 0; height: 0; border-top: 8px solid #F4F4F4; border-left: 8px solid transparent; transform: translateY(-4px) translateX(8px);"></div></div></div> <div style="display: flex; flex-direction: column; flex-grow: 1; justify-content: center; margin-bottom: 24px;"> <div style=" background-color: #F4F4F4; border-radius: 4px; flex-grow: 0; height: 14px; margin-bottom: 6px; width: 224px;"></div> <div style=" background-color: #F4F4F4; border-radius: 4px; flex-grow: 0; height: 14px; width: 144px;"></div></div></a><p style=" color:#c9c8cd; font-family:Arial,sans-serif; font-size:14px; line-height:17px; margin-bottom:0; margin-top:8px; overflow:hidden; padding:8px 0 7px; text-align:center; text-overflow:ellipsis; white-space:nowrap;"><a href="https://www.instagram.com/reel/DQ9CBDwjXGF/?utm_source=ig_embed&amp;utm_campaign=loading" style=" color:#c9c8cd; font-family:Arial,sans-serif; font-size:14px; font-style:normal; font-weight:normal; line-height:17px; text-decoration:none;" target="_blank">A post shared by Streets People Love - Hobart (@streetspeoplelovehobart)</a></p></div></blockquote>
<script async src="//www.instagram.com/embed.js"></script>
<!--kg-card-end: html-->
]]></content:encoded></item><item><title><![CDATA[Kingston Ride2Work Day Breakfast 2025]]></title><description><![CDATA[<p>Kingston&apos;s second Ride2Work Day breakfast took place on Wednesday 15 October at Maxie Coffee on Channel Highway. We set up from 7:30am to 9am, with free coffee and breakfast, to encourage more people to consider riding for transport.</p><h2 id="attendance-and-weather-impact">Attendance and Weather Impact</h2><p>We had 25&#x2013;30</p>]]></description><link>https://mark.id.au/kingston-ride2work-day-breakfast-2025/</link><guid isPermaLink="false">68fb547f2275420001ee8ed5</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Fri, 24 Oct 2025 10:46:43 GMT</pubDate><media:content url="https://mark.id.au/content/images/2025/10/FB_IMG_1760599915449.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2025/10/FB_IMG_1760599915449.jpg" alt="Kingston Ride2Work Day Breakfast 2025"><p>Kingston&apos;s second Ride2Work Day breakfast took place on Wednesday 15 October at Maxie Coffee on Channel Highway. We set up from 7:30am to 9am, with free coffee and breakfast, to encourage more people to consider riding for transport.</p><h2 id="attendance-and-weather-impact">Attendance and Weather Impact</h2><p>We had 25&#x2013;30 attendees come through the breakfast. Down from last year&apos;s near-50, probably due to the multiple days of windy and discouraging weather leading up to Ride2Work Day. When you&apos;re trying to get people on bikes, several consecutive days of headwinds don&apos;t help your cause.</p><p>Ten riders from the Australian Antarctic Division made the trip, continuing their strong support from last year.</p><h2 id="quality-conversations">Quality Conversations</h2><p>I got to have a great conversation with someone who doesn&apos;t normally ride around Kingston but did have a basic workhorse of a bike that they use when travelling. They often tell themselves they need to ride more often, and Ride2Work Day motivated them to choose riding from Kingston Beach to their doctor&apos;s appointment in Kingston.</p><p>That&apos;s exactly what this event is about, giving people that nudge to actually get on their bike instead of just thinking about it.</p><figure class="kg-card kg-image-card"><img src="https://mark.id.au/content/images/2025/10/4342882699113681617-1.jpg" class="kg-image" alt="Kingston Ride2Work Day Breakfast 2025" loading="lazy" width="1280" height="1202" srcset="https://mark.id.au/content/images/size/w600/2025/10/4342882699113681617-1.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/10/4342882699113681617-1.jpg 1000w, https://mark.id.au/content/images/2025/10/4342882699113681617-1.jpg 1280w" sizes="(min-width: 720px) 720px"></figure><h2 id="decision-makers-present">Decision Makers Present</h2><p>Three members of government joined us: Dr. Rosalie Woodruff MP, Mayor Paula Wriedt and Councillor Amanda Midgley, adding their vibrant personalities to the event and giving attendees a chance to talk with decision makers. We were also very happy to have a few Kingborough Council staff from across the road, including CEO Dave Stuart with his years of experience leading active communities.</p><p>Having elected officials and senior council staff at a breakfast of 25-30 people creates informal conversations that rarely happen in formal consultation processes.</p><h2 id="building-tradition">Building Tradition</h2><p>The weather didn&apos;t cooperate this year, but the foundation is there for Kingston&apos;s Ride2Work Day breakfast to become an annual tradition and continue to grow. Meanwhile, the Hobart breakfast at Mawson Place ran from 7:30am with Bicycle Network Tasmania, featuring bike tune-ups, cargo bike displays, and information about the City of Hobart&apos;s E-bike Library. Streets People Love Hobart was there connecting riders with information about building support for better street infrastructure.</p><p>See you next October, hopefully with calmer winds.</p><p><em>This event was made possible with funding contributions from the Australian Antarctic Division, Kingborough Council and individuals, and volunteer labour from Mark Donnellon, Amanda Midgley and Michael Holloway, and the team at </em><a href="https://www.instagram.com/maxie_coffee/?hl=en&amp;ref=mark.id.au" rel="noreferrer"><em>Maxie Coffee</em></a><em>.</em></p>]]></content:encoded></item><item><title><![CDATA[Kingston's Active Transport Success: Whitewater Creek Track Sees 50% Jump in Usage]]></title><description><![CDATA[<h2 id="new-infrastructure-connecting-communities-pays-dividends-as-winter-usage-soars"><strong>New infrastructure connecting communities pays dividends as winter usage soars</strong></h2><p>Kingborough Council&apos;s strategic investment in active transport infrastructure is delivering impressive results, with the Whitewater Creek Track experiencing a remarkable 50% increase in daily usage despite the winter months.</p><p>The council&apos;s recent data reveals that average</p>]]></description><link>https://mark.id.au/kingstons-active-transport-success-whitewater-creek-track-sees-50-jump-in-usage/</link><guid isPermaLink="false">68a5bc6c2275420001ee8e65</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Wed, 20 Aug 2025 13:03:02 GMT</pubDate><media:content url="https://mark.id.au/content/images/2025/08/469197899_900308802216517_5268804636452563749_n.jpg" medium="image"/><content:encoded><![CDATA[<h2 id="new-infrastructure-connecting-communities-pays-dividends-as-winter-usage-soars"><strong>New infrastructure connecting communities pays dividends as winter usage soars</strong></h2><img src="https://mark.id.au/content/images/2025/08/469197899_900308802216517_5268804636452563749_n.jpg" alt="Kingston&apos;s Active Transport Success: Whitewater Creek Track Sees 50% Jump in Usage"><p>Kingborough Council&apos;s strategic investment in active transport infrastructure is delivering impressive results, with the Whitewater Creek Track experiencing a remarkable 50% increase in daily usage despite the winter months.</p><p>The council&apos;s recent data reveals that average daily pedestrian traffic has jumped from 355 people in July 2024 to 530 in June 2025 - a significant increase that demonstrates the community&apos;s appetite for safe, connected pathways.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2025/08/Summerleas-Underpass-May-2025-3-2048x1536-16x9-1.jpg" class="kg-image" alt="Kingston&apos;s Active Transport Success: Whitewater Creek Track Sees 50% Jump in Usage" loading="lazy" width="1487" height="836" srcset="https://mark.id.au/content/images/size/w600/2025/08/Summerleas-Underpass-May-2025-3-2048x1536-16x9-1.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/08/Summerleas-Underpass-May-2025-3-2048x1536-16x9-1.jpg 1000w, https://mark.id.au/content/images/2025/08/Summerleas-Underpass-May-2025-3-2048x1536-16x9-1.jpg 1487w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">The new underpass at Summerleas Road</span></figcaption></figure><h2 id="game-changing-infrastructure">Game-Changing Infrastructure</h2><p>The surge in numbers follows the completion of key infrastructure improvements, including the new Summerleas Road underpass and connecting paths that link Spring Farm to the sports precinct. These developments have safely connected more than 600 homes to Kingborough&apos;s expanding shared path network.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2025/08/PW-DS-SS-John-2048x1536.jpg" class="kg-image" alt="Kingston&apos;s Active Transport Success: Whitewater Creek Track Sees 50% Jump in Usage" loading="lazy" width="2000" height="1500" srcset="https://mark.id.au/content/images/size/w600/2025/08/PW-DS-SS-John-2048x1536.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/08/PW-DS-SS-John-2048x1536.jpg 1000w, https://mark.id.au/content/images/size/w1600/2025/08/PW-DS-SS-John-2048x1536.jpg 1600w, https://mark.id.au/content/images/2025/08/PW-DS-SS-John-2048x1536.jpg 2000w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Mayor Paula Wriedt and Kingborough Council staff presenting a new bridge on the Whitewater Creek track.</span></figcaption></figure><p>&quot;Our community has one of the highest participation rates in recreational walking, so improving these urban active transport links has provided better options for moving about in Kingston off road,&quot; said Mayor Paula Wriedt.</p><p>The Spring Farm end of the track has seen an even more dramatic transformation, with a 60% increase in daily users. This section now provides crucial off-road access connecting the Kingborough Sports Precinct and Kingston High School with residential areas in Spring Farm and Whitewater Estates.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2025/08/534491342_10161199032406734_3521829765593222107_n-1.jpeg" class="kg-image" alt="Kingston&apos;s Active Transport Success: Whitewater Creek Track Sees 50% Jump in Usage" loading="lazy" width="1022" height="758" srcset="https://mark.id.au/content/images/size/w600/2025/08/534491342_10161199032406734_3521829765593222107_n-1.jpeg 600w, https://mark.id.au/content/images/size/w1000/2025/08/534491342_10161199032406734_3521829765593222107_n-1.jpeg 1000w, https://mark.id.au/content/images/2025/08/534491342_10161199032406734_3521829765593222107_n-1.jpeg 1022w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">The Kingborough Chronicle published an article on the Whitewater Creek Track Landcare group&apos;s first working bee.</span></figcaption></figure><h2 id="community-ownership-takes-root">Community Ownership Takes Root</h2><p>The infrastructure improvements aren&apos;t just about transport - they&apos;re fostering genuine community stewardship. The newly formed Whitewater Creek Landcare Group held its inaugural working bee on August 10, attracting 16 dedicated volunteers who spent two hours improving the creek environment.</p><p>Led by coordinator Jenny Forward and supported by Kingborough Council&apos;s Biodiversity Officer Jillian Jones and Algona Reserve Landcare Group coordinator Roland Painter, the volunteers tackled weeding, removed old plastic tree guards, and collected rubbish along both sides of the creek. The group focused on removing invasive species including forget-me-nots, hemlock and broom.</p><p>&quot;Everyone appreciated how much the group could achieve when working together to improve the creek and its surroundings,&quot; Forward noted. The formation of this dedicated Landcare group adds ecological value to the path&apos;s community benefits.</p><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2025/08/523487953_1069415101972552_5055932606662481489_n.jpg" class="kg-image" alt="Kingston&apos;s Active Transport Success: Whitewater Creek Track Sees 50% Jump in Usage" loading="lazy" width="2000" height="1502" srcset="https://mark.id.au/content/images/size/w600/2025/08/523487953_1069415101972552_5055932606662481489_n.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/08/523487953_1069415101972552_5055932606662481489_n.jpg 1000w, https://mark.id.au/content/images/size/w1600/2025/08/523487953_1069415101972552_5055932606662481489_n.jpg 1600w, https://mark.id.au/content/images/2025/08/523487953_1069415101972552_5055932606662481489_n.jpg 2000w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Runners finishing Kingston Park parkrun in the pouring rain.</span></figcaption></figure><h2 id="a-community-embracing-active-living">A Community Embracing Active Living</h2><p>The Whitewater Creek Track serves multiple purposes for the community, hosting everything from daily commuters to recreational walkers and the popular Kingston Park parkrun every Saturday morning. Since launching in September 2019, the parkrun has grown into a cornerstone community event, with 236 events completed and over 48,000 individual finishes recorded.</p><p>The weekly 5km event exemplifies the track&apos;s role in promoting active lifestyles, attracting participants who walk, jog, or run the course regardless of pace or ability. With an average finish time of 34 minutes and 47 seconds, the event welcomes everyone from serious athletes to casual fitness enthusiasts.</p><p><em>Kingston Park parkrun takes place every Saturday at 9:00am at Kingston Park, Goshawk Way. The free community event welcomes participants of all abilities. While not strictly required, remember to register at parkrun.com and bring your barcode to have your finish times recorded. Find out more at </em><a href="https://www.parkrun.com.au/kingstonpark/?ref=mark.id.au" rel="noreferrer"><em>parkrun.com.au</em></a><em> and the event&apos;s active </em><a href="https://www.facebook.com/profile.php?id=100067122152366" rel="noreferrer"><em>Facebook page</em></a><em>. </em></p><h2 id="looking-forward">Looking Forward</h2><p>The 50% increase in winter usage, combined with grassroots environmental initiatives like the new Landcare group, suggests the infrastructure improvements have fundamentally changed how residents engage with this green corridor through Kingston. As warmer weather approaches, these numbers are likely to climb even higher, validating the council&apos;s investment in active transport options.</p><p>For a community already known for high participation in recreational walking, the Whitewater Creek Track enhancements represent more than infrastructure - they&apos;re about creating healthier, more connected neighbourhoods where people can safely choose active transport while actively caring for their local environment.</p><p>The success of these improvements sends a clear message: when councils provide safe, well-connected active transport infrastructure, communities respond enthusiastically with both increased usage and environmental stewardship, regardless of the season.</p>]]></content:encoded></item><item><title><![CDATA[E-motos need policing]]></title><description><![CDATA[<p>Australia, especially Victoria, is struggling with electric motorcycles posing as e-bikes and cheap poorly-regulated components spontaneously catching fire. It has led to e-bikes being banned in public transport and calls to COMPLETELY BAN E-BIKES.</p><p>Police in Australia do not have the ability to enforce the laws that distinguish e-bikes from</p>]]></description><link>https://mark.id.au/e-bikes-need-policing/</link><guid isPermaLink="false">68a4f92d2275420001ee8e30</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Tue, 19 Aug 2025 22:24:00 GMT</pubDate><media:content url="https://mark.id.au/content/images/2025/08/1000006438.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2025/08/1000006438.jpg" alt="E-motos need policing"><p>Australia, especially Victoria, is struggling with electric motorcycles posing as e-bikes and cheap poorly-regulated components spontaneously catching fire. It has led to e-bikes being banned in public transport and calls to COMPLETELY BAN E-BIKES.</p><p>Police in Australia do not have the ability to enforce the laws that distinguish e-bikes from motorcycles. Let&apos;s hope that we see an improvement in enforcement and import regulations instead of more bans on e-bikes.</p>]]></content:encoded></item><item><title><![CDATA[Whitewater Underpass to Summerleas Road Roundabout Path - Construction Soon]]></title><description><![CDATA[<p>Over a year since funding announcements from Hon. Eric Abetz MP - Minister for Transport, Mayor Paula Wriedt and Clr Aldo Antolli, Kingborough Council has put on record that construction is expected to start within weeks.</p><blockquote>The tender for the construction of a 3m wide concrete shared path from the</blockquote>]]></description><link>https://mark.id.au/whitewater-underpass-to-summerleas-road-roundabout-path-construction-soon/</link><guid isPermaLink="false">687dd4462275420001ee8dd0</guid><dc:creator><![CDATA[Mark Donnellon]]></dc:creator><pubDate>Mon, 21 Jul 2025 06:05:00 GMT</pubDate><media:content url="https://mark.id.au/content/images/2025/07/firefox_RDNa6VKrIt.jpg" medium="image"/><content:encoded><![CDATA[<img src="https://mark.id.au/content/images/2025/07/firefox_RDNa6VKrIt.jpg" alt="Whitewater Underpass to Summerleas Road Roundabout Path - Construction Soon"><p>Over a year since funding announcements from Hon. Eric Abetz MP - Minister for Transport, Mayor Paula Wriedt and Clr Aldo Antolli, Kingborough Council has put on record that construction is expected to start within weeks.</p><blockquote>The tender for the construction of a 3m wide concrete shared path from the Summerleas&#x2013;Channel Highway roundabout to the Whitewater underpass has just closed, with nine submissions received. Evaluation is underway, and works are expected to commence in August. - <a href="https://www.kingborough.tas.gov.au/wp-content/uploads/2025/07/Agenda-No.-12-21-July-2025-Public-Copy-excl-attachments.pdf?ref=mark.id.au" rel="noreferrer">Agenda No. 12 - 21 July 2025</a></blockquote><figure class="kg-card kg-image-card kg-card-hascaption"><img src="https://mark.id.au/content/images/2025/07/451218671_470412522256673_6034066022870748696_n-1.jpg" class="kg-image" alt="Whitewater Underpass to Summerleas Road Roundabout Path - Construction Soon" loading="lazy" width="1200" height="1200" srcset="https://mark.id.au/content/images/size/w600/2025/07/451218671_470412522256673_6034066022870748696_n-1.jpg 600w, https://mark.id.au/content/images/size/w1000/2025/07/451218671_470412522256673_6034066022870748696_n-1.jpg 1000w, https://mark.id.au/content/images/2025/07/451218671_470412522256673_6034066022870748696_n-1.jpg 1200w" sizes="(min-width: 720px) 720px"><figcaption><span style="white-space: pre-wrap;">Hon. Eric Abetz MP, Mayor Paula Wriedt and Clr Aldo Antolli posing with large print of the plans titled &quot;BETTER ACTIVE TRANSPORT GRANT PROGRAMS ROUND 2 - Channel Highway to Whitewater Creek Trail shared path&quot;</span></figcaption></figure><p>Sadly, the Better Active Transport Grant Programs, that had been running for over a decade, have not been allocated any further funding in the last proposed state government budget. Meaning access to local paths like this is not likely to be extended to more people any time soon. <a href="https://streetspeoplelovehobart.au/state-government-slashes-funds-to-zero-dollars/?ref=mark.id.au" rel="noreferrer">Read more</a>.</p><p></p><p>UPDATE: Tenders are being assessed in the closed session of council meeting on 4/8/2025</p>]]></content:encoded></item></channel></rss>